ملاحظات إضافية
Research Centre at Bahrain Polytechnic in Campus B, please note that the Bidder is not allowed to submit more than one option and Partial awarding not accepted. Please note that the 7 months as the top maximum duration, that should include both design and implementation stages. The supplier should provide samples of materials and detailed shop drawings for all the required work ,to obtain Bahrain Polytechnic approval before any implementations. Building 25 SO Offices, CIC Offices, Event Space, Meeting Rooms, Social Spaces, Management Offices,Lift Looby, Kitchen, Mentoring Rooms, Boardroom, DARE Office. Any Color to be approved by BP. The exact quantity should be measured on site by the contractors during the site visit before the submission of the quotation. Samples of the items should be provided to obtain BP s approval before implementation. The idea of the artwork will be submitted by BP for the contractor to create the design, print it, and install it,مركز الأبحاث في بوليتكنك البحرين في الحرم الجامعي ب ، يرجى ملاحظة أنه لا يسمح لمقدم العطاء بتقديم أكثر من خيار واحد و لا يتم قبول الترسية الجزئية . يرجى ملاحظة أن المدة القصوى هي سبعة أشهر، و يجب أن تشمل مرحلتي التصميم و التنفيذ . يجب على المورد تقديم عينات من المواد و الرسومات التنفيذية التفصيلية لجميع الأعمال المطلوبة للحصول على موافقة بوليتكنك البحرين قبل أي عمليات تنفيذ. المبنى 25 مكاتب SO، مكاتب CIC ، مساحة للفعاليات، غرف الاجتماعات، المساحات الاجتماعية ، مكاتب الإدارة ، ردهة المصعد ، المطبخ ، غرف التوجيه ، غرفة الاجتماعات ، مكتب DARE. أي لون تتم الموافقة عليه من قبل بوليتكنك البحرين يجب قياس الكمية الدقيقة في الموقع من قبل المقاولين أثناء زيارة الموقع قبل تقديم عرض الأسعار. و يجب تقديم عينات من العناصر للحصول على موافقة بحرين بوليتكنك قبل التنفيذ. سيتم تقديم فكرة العمل الفني من قبل بحرين بوليتكنك للمقاول لإنشاء التصميم و طباعته و تثبيته.