MOW-2025-333
STAGE-1 COD BLOWER INSTALLATION WORK WITH SUPPLYING OF MATERIALS AT TERTIARY TREATMENT PLANT, TUBLI WPCC.
Tubli Water Pollution Control Centre (TWPCC) is designed to produce 200,000 m3 of Treated Sanitary Effluent (TSE) on daily basis. This Contract is for installation services for COD system in Stage-1 in Tertiary treatment Plant.
CODs are the equipment’s which are destructs the unreacted Ozone at Stage 1&2.
In stage 1 and stage 2, there are 3 no. of 1500m3 and 2 no. of 1000m3 capacity. The phenomenon of COD is the conversion of triatomic ozone molecule to diatomic oxygen molecule by passing the catalyst material to avoid environmental pollution.
The project is to supply Catalyst Ozone destructor spare parts also includes supply of materials for various areas in the tertiary treatment plant. This initiative guarantees continuous TSE production within the desired quality parameters to ensure reliability and operational efficiency.
خدمات اعمال التركيب لجهاز الدفع الهوائي في منطقة المرحلة الاولى لمحطة المعالجة الثلاثية بمحطة توبلي لمعالجة مياه الصرف الصحي
تم تصميم مركز تحكم تلوث المياه بتوبلي لإنتاج 200,000 متر مكعب من المياه المعالجة الصحية يوميًا. يهدف هذا العقد إلى تقديم خدمات تركيب نظام إزالة الأوزون في المرحلة الأولى من محطة المعالجة الثلاثية.
يعتبر نظام إزالة الأوزون مجموعة من المعدات المصممة لتدمير الأوزون غير المتفاعل في المرحلتين الأولى والثانية. في المرحلة الأولى والثانية، توجد ثلاث وحدات بسعة 1500 متر مكعب ووحدتان بسعة 1000 متر مكعب. تعتمد تقنية إزالة الأوزون على تحويل جزيئات الأوزون الثلاثية إلى جزيئات أكسجين ثنائية من خلال تمريرها عبر مادة محفزة، مما يساعد على الحد من التلوث البيئي.
يشمل نطاق العمل توريد قطع الغيار لمدمر الأوزون باستخدام تقنية الكاتاليست وتوريد قطع غيار لمناطق مختلفة في محطة المعالجة الثلاثية. يتضمن المشروع أيضًا تعديلات لضمان التوافق مع النظام الحالي. سيضمن ذلك الإنتاج المستمر لمياه الصرف الصحي المعالجة بالجودة المطلوبة في محطة المعالجة الثلاثية.