The Supreme Council for the Environment (SCE) is managing the operation of Arad Bay Park in Muharraq and now intends to engage a locally registered and experienced Contactor to provide repair & maintenance of wooden walkway bridge at Arad Bay Protected Area and Park. The Bids are to be submitted by a single Contractor, as per the scope of work. The responsibility of work will be on the Contractor regarding all services to be provided as per the Scope of Work. The wooden walkway bridge is in the north of the park which was constructed some 13 years back and is approx. 200 meters long and 4 meters wide. The location of the bridge is attached. The bridge requires urgent repair and maintenance due to fast deterioration happening mainly in timber and structural works due to interaction of saline sea water with the structure and harsh weather conditions.
يدير المجلس الأعلى للبيئة تشغيل منتزه دوحة عراد في المحرق ويعتزم الآن الاستعانة بمقاول مسجل محليا وذو خبرة لتوفير إصلاح وصيانة جسر الممشى الخشبي في دوحة عراد. يجب تقديم العطاءات من قبل مقاول واحد . تقع مسؤولية الأعمال على عاتق المقاول فيما يتعلق بجميع الخدمات التي سيتم تقديمها وفقا لنطاق العمل. يقع جسر الممشى الخشبي في شمال الحديقة التي تم بناؤها منذ حوالي 13 عاما ويبلغ طولها حوالي 200 متر وعرضها 4 أمتار. موقع الجسر مرفق. يتطلب الجسر إصلاحا وصيانة عاجلة بسبب التدهور السريع الذي يحدث بشكل رئيسي في الأخشاب والأعمال الهيكلية بسبب تفاعل مياه البحر المالحة مع الهيكل والظروف الجوية القاسية.