The requested items are replacement Tubes required by Field Maintenance to be used in Inter stage and after Cooler Bundles of Air Cooler. Those tubes are required to be able to perform essential Preventative Maintenance (PM) work on the Field maintenance activities , to meet all emergencies, corrective and preventive maintenance plans to avoid shutdown of the unit and production loss.
The requested items are an inventory items and repeatedly ordered based on the MIN/MAX levels, these items have reached the minimum stock level must be re-ordered.
Part A: Mandatory Technical Criteria
All bidders must pass this mandatory section to move forward to be evaluated under Part B. Failure of bidders to meet any of the criteria in this section will result in technical failure.