Tender is for the provision of Workover Rigs & Associated Services on a call-off basis. Contractor’s performance of the Work shall include but not limited to, rig mobilization/demobilization, and range of well intervention and remedial tasks such as wellbore cleanout, equipment repair, stimulation treatments, and re-entry operations. And the provision of Workover Rig (HP 550) and Workover Rig (HP 750).
A. General Mandatory Criteria:
A.1 Health, Safety and Environment Requirements
A.2 Quality Assurance and Quality Control
A.3 Financial Evaluation
B. 550 HP Work over Rig Mandatory Criteria
B.1 General Characteristics
B.2 Major Workover Unit Components
B.3 Rig Power System (Bidder to provide support document for this criteria)
B.4 Workover Fluid System
B.5 Blowout Prevention Equipment
B.6 Rod Equipment
B.7 Drill String and Handling tools
B.8 Drilling Instrumentation and Control Equipment
B.9 Auxiliary and Miscellaneous Equipment (Bidder to provide support document for this criteria).
B.10 Inspection required and other Specifications
B.11 Contractor Personnel
C. 750 HP Work over Rig Mandatory Criteria
C.1 General Characteristics
C.2 Major Workover Unit Components
C.3 Rig Power System (Bidder to provide support document for this criteria)
C.4 Workover Fluid System
C.5 Blowout Prevention Equipment
C.6 Rod Equipment
C.7 Drill String and Handling tools (Bidder to provide support document for this criteria)
C.8 Drilling Instrumentation and Control Equipment
C.9 Auxiliary and Miscellaneous Equipment
C.10 Inspection required and other Specifications
C.11 Contractor Personnel