Mandatory Criteria
1 Bidder shall confirm compliance with all requirements as specified into the RFQ and all attachments thereto (refer Note 2 below)
2- The bidders shall submit the list of their proposed manufacturer from whom these tubes are sourced.
For each of the proposed manufacturer, the bidder shall submit the documents as per the list “Documents for Proposed Sub-vendor Evaluation” attached to theabove RFQ for review.