Arabic Title: توفير خدمات السقالات لشركة بابكو للتكرير
English Title: Provision of Scaffolding Services for Bapco Refining
Scope of work (Arabic):
يتضمن العمل توفير الموارد والتصميم وتركيب السقالات والتفتيش والتعديل والتفكيك وإزالة السقالات، وبالتالي توفير وسيلة آمنة للوصول / الخروج من مواقع العمل داخل مناطق العمل التابعة للشركة
Scope of work (English): The work comprises the provision of resources, design, erection (construction), inspection, certification, hiring, alteration, dismantling and removal of scaffolding, thus supplying a safe means of access/egress to site workplaces within the Company’s operating areas including, but not limited to; Refinery, Refinery Tank Farm, Sitra Tank Farm, Marketing Terminal, Sitra Wharf, New Island Wharf (offshore), Pipelines, Wet Gap, Gas Distribution Network (GDN) and Awali town.
,
Mandatory Evaluation Criteria:
- The Bidder shall have at least Five (5) years workexperience over the last ten (10) years in the Oil / Gas / PetrochemicalIndustry with sound record in providing scaffolding services for processplant routine maintenance or turnarounds or major tank repair orconstruction work.
- The Bidder shall meet the followingrequirement for permanent work force in their organization for scaffoldingwork. The approximate trade wise requirements for each contract for thesubject tender are:
(1) Scaffold Supervisor (4 Nos.),
(2) Scaffold Foreman (6 Nos),
(3) Scaffolders (75 Nos.)
(4) Safety Officer (NEBOSH IGC Level 3 qualified) - 1 No.
Above listed Manpower shall have adequate technical knowledge and experience in services outlined under the Tender Specification and fully comply with trade skills and experience requirements in File 1 Appendix '1' & ‘2’ attached hereto. The contractor shall be prepared to assign the above listed manpower to the Company's work, if awarded the contract, as required.
- The Bidder shall own, as minimum, the following keyplants and equipment listed below that are well maintained, in goodworking condition and safe for use in an Oil & Gas or PetrochemicalIndustry environment:
- 30,000 numbers of Standard (galvanised/painted) scaffold pipes of different lengths
- 60,000 numbers of Ledger (galvanised/painted) of different lengths
- 10,000 numbers of Putlog/Transom couplers (galvanised/painted) of different lengths
- 100,000 numbers of Fittings (assorted) of different types (i.e. ladder clamps, Gravlock couplers, sleeve couplers (joint box), single & double couplers, swivel couplers, board retaining clips, etc.)
- 20,000 numbers of Steel Board (galvanised/painted) of different lengths
- 10,000 Scaffold Screw Jack
- The Bidder shall have a fully auditable and activeSafety Policy in operation within their organization and shall beaccredited with formal certification for OHSAS 18001 or ISO 45001certification, which are currently valid or in the process of re-validation.