Supply of Casing Vapor Recovery (CVR)
Bapco Upstream currently concluded phase 5 of the casing vapor recovery (CVR) program where a total of 274 beam pump unit wells are connected to a designated network located in the center of the Bahrain oil field. This network has a compression of 12.4 MMSCFD by using 6 compressors located at TB07 and TB08. The intention of the next phase in this program is to increase the network capacity by another 6 MMSCFD through the procurement and installation of two sliding vane compressors to be installed at WM30, while also expanding the network to the south and hooking up an additional 75 wells in the process. The expected production gain at hook up is approximately 568 Barrels of Oil Per Day (BOPD).
توريد غلاف استعادة البخار
اختتمت شركة بابكو للتنقيب حاليًا المرحلة الخامسة من برنامج استعادة بخار التغليف (CVR) حيث تم ربط إجمالي 274 بئرًا من وحدات الضخ بشبكة محددة تقع في وسط حقل نفط البحرين. تتمتع هذه الشبكة بضغط يصل إلى 12.4 MMSCFD باستخدام 6 ضواغط موجودة في TB07 وTB08. الهدف من المرحلة التالية في هذا البرنامج هو زيادة سعة الشبكة بمقدار 6 ملايين قدم مكعب قياسي أخرى من خلال شراء وتركيب ضاغطين دوارين منزلقين سيتم تركيبهما في WM30، مع توسيع الشبكة أيضًا إلى الجنوب وربط 75 بئرًا إضافية. في هذه العملية. تبلغ الزيادة المتوقعة في الإنتاج عند التوصيل حوالي 568 برميلًا من النفط يوميًا (BOPD).
Bidders shall meet the below mandatory criteria to be evaluated further:
1- Bidder shall confirm compliance with the listed requirements and tender scope of work, all Company & Project specifications, Company Policies, Standards & Procedures and applicable International design standards as specified and listed in the tender documents. Note: Any exceptions shall be stated clearly in the deviation list. EXCEPTIONS MAY BE DETRIMENTAL TO THE CONSIDERATION OF BID
2- Bidder shall have direct relevant work experience of not less than five (5) years (inclusive of minimum one package delivery in the past 5 years) of compressors packaging including engineering design, procurement, fabrication & supply of industrial natural gas compression packages.
3- Bidder shall submit a financial statement audit by third-party auditor for 3 years minimum. (Current Ratio/ Debit Ratio/ Profit Margin Ratio).