Mandatory Requirements
Failure to submit any of the mandatory Prequalification Requirements listed will result in rejecting the prequalification application.
1. Documents:
1.1 Schedule of Guarantee of WDD items specification. The form shall be fully filled-up, signed and stamped by manufacturer and vendor.
1.2 Application for Prequalification Questionnaire. Shall be fully filled-up, signed and stamped by manufacturer and vendor.
1.3 Declarations requested by EWA/PSD
1.3.1 Independent TPI for tests
1.3.2 Audited Financial Report
1.3.3 Samples
1.4. Samples. Minimum of 2 and Maximum of 5 non-returnable samples to be submitted. (Quantity will be agreed on with WDD after closing date and submitted to WDD offices. Supplier must have samples ready and available at time of application and submit samples within 1 month from opening date)
1.5 Financial Submission. Submit last three consecutive years’ financial audited report of the manufacturer.
2. Failure of applicant to meet the minimum scoring (6% out of 15%) in Financial Strength will result in application will be rejected.
3. Failure of applicant to meet the minimum overall scoring (75%) in total will result in failure.
4. Sample must have good performance overall to be considered satisfactory.