The Supreme Council for the Environment (SCE) plans to provide suitable offices to accommodate the new Chief Executive Officer recently appointed by the Government. These offices will be at the same location as SCE offices which are in Sehab Tower (B) Seef District.
The SCE is planning to undertake renovation work on the 10th floor of the Sehab Tower Building (B) in the Seef district as well as providing necessary works for furniture and IT works.
The SCE has prepared a list of construction work, Electrical furniture, Mechanical and IT works requirements that need to be provided on the floor. This is to ensure the newly appointed CEO and staff can move into their designated offices without any delay, as they are currently using the temporary office space.
The renovation involves preparing the floor to match the needs and requirements of the new general managers and their staff.
يعتزم المجلس الأعلى للبيئة توفير مكاتب مناسبة لاستيعاب الرئيس التنفيذي الذي تم تعيينه مؤخرًا. وستكون هذه المكاتب في نفس موقع مكاتب المجلس الحالية في برج سحاب ب بمنطقة السيف.
ويخطط المجلس الأعلى للبيئة لتنفيذ أعمال تجديد في الطابق العاشر لمبنى برج سحاب ب في منطقة السيف، إلى جانب تنفيذ الأعمال اللازمة الخاصة بتوفير الأثاث وأعمال تقنية المعلومات.
وقد أعدّ المجلس الأعلى للبيئة قائمة بأعمال الإنشاءات، والأعمال الكهربائية، وأعمال توفير الأثاث، والأعمال الميكانيكية، وأعمال تقنية المعلومات المطلوب تنفيذها في الطابق المذكور، وذلك لضمان انتقال الرئيس التنفيذي الجديد والموظفين إلى مكاتبهم المخصصة دون أي تأخير، حيث إنهم يشغلون حاليًا مكاتب مؤقتة. وتشمل أعمال التجديد تهيئة الطابق بما يتوافق مع احتياجات ومتطلبات المديرين العامين الجدد وفرق العمل التابعة لهم.