تعتزم إدارة الخدمات العامة والمخازن المركزية بهيئة الكهرباء والماء على شراء كابلات أرضية، بجهد 11 كيلوفولت، المعدن الموصل: ألومنيوم، حجم: 300 ملمتر مربع ، الطول: 500 مترلكل بكرة بعقد زمني لغرض استخدامها من قبل إدارة توزيع الكهرباء حسب الوصف والكميات التالية:
CABLE, U/G POWER, 6.35/11 KV, 3 CORE, SIZE: 300 MM², 61 STRANDS, COMPACTED CIRCULAR, ALUMINIUM CONDUCTOR, XLPE INSULATED COPPER TAPE SCREENED, SWA/PVC TO EDD SPEC.ED7 AND AMD 1 OF JANUARY 1994 EXEPT HOT SET TEST TO BE CONDUCTED ON 10% OF ORDER QUANTITY, CABLE ON STEEL DRUM TO BE CONTINUOUS LENGTH OF 500 M, CSD TO GIVE BASE METAL PRICE WITH TENDER.
Forecasted QTY: 240,000 M – Buffer QTY: 20,000 M.
The General Services and Central Stores Directorate would like to purchase Cable, Underground, 11KV, AL, Size: 300SQMM as per the following description and quantity:
CABLE, U/G POWER, 6.35/11 KV, 3 CORE, SIZE: 300 MM², 61 STRANDS, COMPACTED CIRCULAR, ALUMINIUM CONDUCTOR, XLPE INSULATED COPPER TAPE SCREENED, SWA/PVC TO EDD SPEC.ED7 AND AMD 1 OF JANUARY 1994 EXEPT HOT SET TEST TO BE CONDUCTED ON 10% OF ORDER QUANTITY, CABLE ON STEEL DRUM TO BE CONTINUOUS LENGTH OF 500 M, CSD TO GIVE BASE METAL PRICE WITH TENDER.
Forecasted QTY: 240,000 M – Buffer QTY: 20,000 M.
Approved Manufacturers:
• Al Fanar Company - Saudi Arabia
• CNEW a) XINJIANG Factory (TBEA) - China
• Gulf Cables & electrical Industries Group Company (K.S.C.P.) - Kuwait
• Hellenic Cables S.A. - Greece
• Jeddah Cable Company - Saudi Arabia
• Riyadh Cables Group - Saudi Arabia
• Saudi Cable Company - Saudi Arabia
• Dubai Cable Company Pvt. Ltd. (DUCAB) - United Arab Emirates
• National Cable Industry – United Arab Emirates
Mandatory Requirements:
1. Only offers from approved manufacturers will be evaluated.
2. It is mandatory to state the country of origin of the Item.
3. Meeting specified guarantee period is mandatory (48 months).
4. Non-submission of mandatory documents (Schedule of guarantee dully filled-in and endorsed/stamped by both manufacturer and vendor, Complete copies of type test reports, relevant technical drawings, any other documents to support the offer as per EDD Specifications) will retender the offer null and void (rejected).