Bidders must abide by all the Mandatory Requirements mentioned in the below list that must be provided in the Air Conditioning Units, and in the event of non-compliance, the bid will be rejected.
Please tick (√) Yes or No. S/No.
1. Confirm that the cooling capacity of the units offered matches with the specification requirements.
2. Confirm that all the compressors for each unit will be heavy duty piston or scroll or rotary type (inverter).
3. For industrial Units Confirm that the unit will be provided with metal components for (Blower, Body, and fins).
4. Confirm that additional GI tray with the bottom of the tray insulated with Armaflex rubber insulation with separate drain will be provided.
5. Confirm that All the A/C units will be provided with copper coils and Aluminium fins.
6. Confirm that all coils, U Bends, welded tubes, headers & coil casing will be pre-coated with phenolic (Heresite) coating.
7. The Air-conditioning (A/C) units shall be pre-approved by Electricity and Water Authority (EWA), Kingdom of Bahrain, and should have a minimum of Six (6) stars energy rating (EER not less than 11.5) . The refrigerant used shall be CFC free, environment friendly type (R410a, R407c).
8. Confirm that all the AC units are in compliance with the terms of guarantee mentioned in the specifications
9. The Tenderer must provide (highlight) in his tender catalogues showing all technical data, giving full information on the efficiency of the design, performance, capacities, dimensions, materials properties and all other pertinent information of units proposed by him.