Tender Description: Stable production from Tatweer’s Non-Associated Gas-NAG reservoir is required in order to meet the Kingdom of Bahrain’s gas demand. As part of the long term field development plan and in order to ensure that gas demand is met.
NAG من تطوير لتلبية طلب مملكة البحرين من الغاز. كجزء من خطة تطوير الحقل على المدى الطويل ومن أجل ضمان تلبية الطلب على الغاز ، فقد تقرر تثبيت خمس -5- محطات ضغط رأس NAG Well
Mandatory Technical Evaluation Criteria
1Bidder shall confirm by letter that their proposal is compliant with all Companys requirements as per the tender Scope of Work.
2Inlet Pressure for each compressor station is 400 PSIG at Compressor Suction
3Inlet Temperature for each compressor station is 200 F
4Discharge Pressure for each compressor station 1200 - 1550 PSIG at Compressor Discharge
5Discharge Temperature for each compressor station 140 degF must be aligned with downstream GDU inlet temperature
6Volumetric Flow rate at the discharge - export meter MMSCFD of each compressor station number shall be exclusive of fuel gas usage:
•NCF04 Well Head Compressor Station - South = 60 MMSCFD
•NCF07 Well Head Compressor Station - Center-II = 200 MMSCFD
•NCF03 Well Head Compressor Station - North = 80 MMSCFD
•NCF05 Well Head Compressor Station - Center-I = 80 MMSCFD
•NCF06 Well Head Compressor Station - East = 100 MMSCFD
7All equipment provided by the Bidder MUST be brand new.
8Confirm percent availability guarantee minimum 98 percent