TP-0974-2022- Provision of fleet vehicle leasing | | |
| | | | |
PART I - MANDATORY CRITERIA | | |
Criteria No. | Description | Critical Item | Unit of Evaluation |
(Y/N) |
1 | | | | |
A | Brand New Vehicles (2023 and 2024) Vehicle brand to have experience in Bahrain market for more than 15 years (tobe confirmed by letter) | Yes | Pass/ Fail |
B | Bidder must have 15 years’ experience in the scope of work provided.(Bidder to attach any supporting documents as necessary) | Yes | Pass/ Fail |
C | All vehicles must meet the high quality specifications for use in“off-road”, withstand of high temperature and carry heavy weights with theavailability of technical specifications certificates in this regard. (Bidderto attach any supporting documents as necessary) | Yes | Pass/ Fail |
D | All vehicles should be equipped with driver and passenger airbags (toconfirm by letter) | Yes | Pass/ Fail |
E | To install bed liner cover for pickup category (free of charge)(Bidder to attach any supporting documents as necessary) | Yes | Pass/ Fail |
F | Seat cover to be available free of charge upon request (Bidder toattach any supporting documents as necessary) | Yes | Pass/ Fail |
G | All vehicles should be fitted with fire extinguishers and first aidkits. (Bidder to attach any supporting documents as necessary) | Yes | Pass/ Fail |
H | All vehicles should be fitted with desert graded road tires. (Bidderto attach any supporting documents as necessary) | Yes | Pass/ Fail |
I | All Pick Up’s should be equipped with 2 (two) seatbelts in the frontand 3 (three) in the back (Bidder to attach any supporting documents asnecessary) | Yes | Pass/ Fail |
J | 4WD pick up and Full-size SUV 4X4 should be equipped with off roadtires. (Bidder to attach any supporting documents as necessary) | Yes | Pass/ Fail |
K | The Contractor must ensure that at least 30 back-ups for each categoryvehicle must be provided at Company premises for immediate replacement incase of pulled out for periodic maintenance, sudden breakdown or accident.Replacement vehicles shall be free of charge and will be installed withcompany tracking system. (Bidder to attach any supporting documents asnecessary) | Yes | Pass/ Fail |
L | Contractor shall not apply annual mileage parameter to all vehicles.(Bidder to attach any supporting documents as necessary) | Yes | Pass/ Fail |
Part I - Mandatory Criteria Score | Pass/ Fail |