The Authority of Electricity and Water in the Kingdom of Bahrain plans to upgrade the outdated 220V and 48V DC battery chargers in Electricity Transmission Primary Substations. These chargers have been in service for over 20 years. The upgrade process involves assessing the current condition of the system and implementing necessary replacements and remedial actions.
The modernization of these battery chargers is crucial for ensuring the reliability and efficiency of the electricity transmission network. By replacing the outdated equipment with advanced technology, EWA aims to enhance the overall performance and safety of the substations. This initiative is part of a broader strategy to upgrade the infrastructure and support the growing energy demands of the Kingdom of Bahrain.
تخطط هيئة الكهرباء والماء في مملكة البحرين لتحديث شواحن البطاريات القديمة بنظامي 48 فولت و 220 فولت (تيار مستمر) في محطات التحويل الرئيسية الخاصة بنقل الكهرباء. هذه الشواحن خدمت لأكثر من 20 عامًا. يشمل عملية التحديث تقييم الحالة الحالية للنظام وتنفيذ الاستبدالات والإجراءات التصحيحية اللازمة.
تحديث هذه الشواحن الكهربائية يُعد أمرًا بالغ الأهمية لضمان موثوقية وكفاءة شبكة نقل الكهرباء. من خلال استبدال المعدات القديمة بتقنيات متقدمة، تهدف هيئة الكهرباء والماء إلى تعزيز الأداء العام والسلامة في محطات التحويل. وتأتي هذه المبادرة ضمن استراتيجية أوسع لتحديث البنية التحتية ودعم الطلب المتزايد على الطاقة في مملكة البحرين.
,
Mandatory/Essential Requirements
Vendors shall follow and meet the following Mandatory/Essential Requirements. Offers not complying to the following shall be rejected and not to be considered for Evaluation:
1. The tenderer shall offer Battery Chargers proven in- service life and free from outstanding issues in transmission network or in-service of more than 3 years in GCC (including Bahrain).
For battery chargers not installed in Transmission Network of Bahrain, a reference list to be submitted with evidence from the client.