Supply of Pipeline for Phase 1 of LNG project
توريد خط أنابيب للمرحلة الاولى من مشروع الغاز الطبيعي المسال
The company, Tatweer Petroleum aim to lay 2 x 24” pipelines of regasified liquid natural gas (RLNG) between AGS J/O to DDP including two new stations AVS and HVS. The pipelines to be installed above the ground from AGS J/O to AVS, AVS to HVS, HVS to DDP and to finalize the Tie-in in these four locations. As part of phased approach to installation, Tatweer Petroleum will be installing 2 x 24” pipelines from AGS J/O to AVS during 2023. It is therefore a requirement that TP need to purchase 24” pipeline materials for both line routing and bends in line with the datasheets produced for the project.
* Along with meeting the mandatory criteria bidder must meet the below:
1) Bidder’s offered product is approved in Oil and Gas companies (minimum 3 ) within GCC for similar service.
2) Bidder is certified and operates an effective documented quality management system based on the requirements of ISO 9001:2015, or a COMPANY approved equivalent such as ASME or API.
3) Bidder will source materials directly from MILL or through the authorized agent.
4) Bidder has provided the proof evidence of manufacture's previous experience for manufacture and supply of similar RFQ items as per scope & specifications (minimum 3 Years)