REPLACEMENT OF OF PACKAGED AIR CONDITIONING UNITS at AHMED ALI KANOO HC
Tender Number: 606/2023/BTB (PHC/105/2023)
PA Ref Number: PHC/105/2023
Tender Description
Remove the existing 3 Nos Roof Top Packaged Air Conditioning Units and replace them with new units at Ahmed Ali Kanoo HC. The Primary Healthcare Centers hereafter mentioned as (PHC), is looking for contractors for remove the existing Six (6) Roofs Top Packaged Units (407 a Refrigerant gas) and replace them with new Packaged units, the units must be at ambient temperature, based on Dry Bulb Temperature of air entering Condensing Coil and Wet Bulb Temperature of air entering Evaporator. The unit s Total Cooling capacities required are A) Supply & Installation of 1 No. 192000 btu per hr, Pac. AC Units Supply and fix cable 25mm from unit to Main Isolator. B) Supply & Installation of 1 No. 192000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator. C) Supply & Installation of 1 No. 288000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator
- Issued by
- PRIMARY HEALTHCARE CENTERS
- Category/Sector
- General
- Internal/External
- External
- Invitation Method
- Public (LOCAL GCC)
- Initial Bond
- BD 500
- Bid Validity / Initial Bond Validity Period (Days)
- 180 days
- Tender Fees
- BD 15
- Contract Duration
- 12 Month
- Is Alternate Bid Allowed
- Yes
- Publish Date
- Wednesday, 30 August 2023
- Purchase Before
- Tuesday, 12 September 2023
- Closing Date
- Wednesday, 20 September 2023
- Opening Date
- Thursday, 21 September 2023
Additional Notes
Remove the existing 3 Nos Roof Top Packaged Air Conditioning Units and replace them with new units at Ahmed Ali Kanoo HC. The Primary Healthcare Centers hereafter mentioned as (PHC), is looking for contractors for remove the existing Six (6) Roofs Top Packaged Units (407 a Refrigerant gas) and replace them with new Packaged units, the units must be at ambient temperature, based on Dry Bulb Temperature of air entering Condensing Coil and Wet Bulb Temperature of air entering Evaporator. The unit s Total Cooling capacities required are A) Supply & Installation of 1 No. 192000 btu per hr, Pac. AC Units Supply and fix cable 25mm from unit to Main Isolator. B) Supply & Installation of 1 No. 192000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator. C) Supply & Installation of 1 No. 288000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator ,إزالة الأجهزة القديمة و تزويد و تركيب عدد 3 جديدة اجهزة التبريد و الوحدات المعبأة العلوية بأستخدام غازات التبريد تبحث مراكز الرعاية الصحية الأولية المشار إليها فيما يلي باسم (PHC) ، عن مقاولين لإزالة الأسطح الستة (6) الموجودة الوحدات المعبأة العلوية (407 أ غاز التبريد) واستبدالها بوحدات معبأة جديدة ، يجب أن تكون الوحدات في درجة الحرارة المحيطة ، بناء على درجة حرارة المصباح الجاف للهواء الداخل إلى ملف التكثيف ودرجة حرارة المصباح الرطب للهواء الداخل إلى المبخر. قدرات التبريد الإجمالية المطلوبة للوحدة هي A) Supply & Installation of 1 No. 192000 btu per hr, Pac. AC Units Supply and fix cable 25mm from unit to Main Isolator. B) Supply & Installation of 1 No. 192000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator. C) Supply & Installation of 1 No. 288000 btu per hr Pac. AC Units. Supply and fix cable 25mm from unit to Main Isolator